Projects - Design a new bridge deck
At the location of this lifting bridge over the River Hull the river is tidal
and navigable. In order to allow shipping to pass the bridge lifts on a regular
basis. The road across the bridge is an important route for local traffic.
We were commissioned by the East Riding of Yorkshire Council to design a new
bridge deck to replace the existing timber sleeper deck.
The bridge is made up of aluminium sections and it was
proposed to use aluminium in the new deck to avoid the problems associated with
corrosion if dissimilar metals were used.
It was critical that the new bridge deck could be fitted quickly to minimise the
length of the bridge closure and also the weight of the new deck must be
similar to the existing weight to ensure that the balance of the bridge was not
disturbed.
The
new deck was designed in segments to allow offsite prefabrication. The sections
were designed to be fixed to the existing structure with 'Lindapters' to avoid
the need for on site drilling.
Site work commenced on Monday morning and the existing deck was removed. Seven
deck sections were lifted into place and welded together to form the continuous
deck. As work progressed above the lindapters were fitted below.
The welded joints were then prepared and the gritted epoxy resin surfacing
installed at the joints to give a smooth uniform non slip surface.