TALK TO US

08700 339911

UKBS Plc Hull High School Junior Reception Block

Projects - Hull High School Junior Reception Block

This unique school building extension has utilised a circular tower to create an exciting new facility on a mature site.

UKBS PlcL Structural Design Project - Hull High School Junior Reception BlockStructural design and detailing for the building was carried out in close liaison with the Building Designer to ensure the vision of the building became a reality.

UKBS PlcL Structural Design Project - Hull High School Junior Reception Block Foundation design utilises conventional strip and pad foundations on firm clay subsoil but due to the presence of mature trees the foundations were deepened to guard against clay shrinkage or heave.

Careful checking of the masonry walls was carried out to ensure that brickwork was adequately restrained by the structural frame.

Contract Details

  • Client: Church Schools Company
  • Value: £750,000
  • Structural Engineers: UKBS Plc
  • Architects: Gammond Evans Crichton Limited

News






UKBS - affiliated to SGS UKBS - affiliated to Royal Institution of Chartered Surveyors UKBS - Contractors Health and Safety Assessment Scheme

Our low staff turnover, positive client attitude and genuine national office coverage ensures that our clients receive the optimum service from UKBS.